Water Supply & Drainage
PVC, PE and UPVC pipe systems; ductile iron fittings; flanges; gate, check, air-release and relief valves; flow meters and pressure gauges.
UGANDA-BASED PROJECT SUPPLY
We supply pipes, fittings, valves and meters for government water supply, drainage and irrigation projects. Our Uganda team supports BOQ review, product matching, inspection, packing and delivery across Africa.
Send us the BOQ or drawings. We will match the specifications, confirm standards and prepare a clear quotation.

We check each line against the required size, pressure rating, material and standard before quoting.
Complete pipeline systems for public water, irrigation and municipal infrastructure.
Africa infrastructure
PROJECT TYPES
We work from BOQs and drawings to assemble the pipework, valves, instruments and accessories required for each project.
PVC, PE and UPVC pipe systems; ductile iron fittings; flanges; gate, check, air-release and relief valves; flow meters and pressure gauges.
HDPE main and submain pipe, control valves, water meters, filtration assemblies, washout fittings and lateral connections.
Flanged pipework, reducers, tees, dismantling joints, flexible rubber joints, meters, sensors, gauges and accessories.
Project-specific pipework and related components for municipal networks, public facilities and walkway works.

AFRICAN PROJECT REFERENCE
A complete water-supply package covering DN25-DN600 pipework, fittings, valves, meters, sensors and installation accessories.
The schedule included UPVC, PVC, galvanized steel, stainless steel and ductile iron items, with flanged connections and pressure classes up to PN25. We matched the line items as one coordinated supply package.

IRRIGATION PROJECT REFERENCE
A 2,747 m HDPE main and submain package in 63, 75 and 90 mm, supplied with pump connections, filtration and control components.
The schedule covered PN8 and PN10 HDPE pipe, water meters, gate and control valves, filtration assemblies, washout fittings, borehole riser pipe, lateral connections and project spares.
CORE MANUFACTURING
For large diameters, unusual dimensions or project-specific drawings, we coordinate technical review and custom manufacturing before quotation.
Fabricated tees, reducers, stub ends, flanges and DN800-DN1200 SDR26 pipe caps for large pipeline work.
Non-standard bends, tees, reducers, flanged pieces and connection fittings produced to project drawings.
Check dimensions, pressure class, drilling, lining, coating and applicable standards before production.
Coordinate dimensional checks, documentation, protective packing and shipment marking for project delivery.

AFRICAN PROJECT MARKETS
Our Uganda team handles day-to-day project coordination and BOQ follow-up. We also support projects in Ethiopia, Somaliland, Eritrea and Mauritania.
Local project coordination, BOQ follow-up and delivery planning.
Ethiopia, Somaliland and Eritrea: water supply, borehole and municipal pipeline requirements.
Mauritania: project quotations and coordinated supply for water and irrigation works.
INTERNATIONAL PROJECT REFERENCES
Saudi Arabia: DN800-DN1200 SDR26 custom HDPE pipe caps for a large-diameter pipeline project.
Dubai: custom ductile iron fittings produced to project dimensions and connection requirements. These projects show how we review non-standard specifications and coordinate production before shipment.

TENDER & BOQ SUPPORT
A practical three-stage process for contractors, utilities and EPC teams buying mixed pipeline packages.
We check sizes, quantities, pressure classes, materials, connection details and required standards before pricing.
We confirm standards, drawings and technical data, then prepare the documents or samples required for approval.
We coordinate inspection points, document checks, protective packing, shipping marks and delivery planning.
PROJECT INQUIRY
Tell us the project country, pipe material, sizes, pressure class, quantities, standards and required delivery schedule.
BOQ & DRAWING INTAKE
Include the country, project type, specifications and estimated quantities. Attachments can be shared during follow-up.